![]()
A number of 3D walkthrough sequences showing the new construction within the Ashmolean Museum in Oxford used for publicity and fundraising purposes.
A large part of the existing building is to be demolished with a new collection of spacious galleries being built in it's place. The new construction will mean a doubling of the museums current exhibition space.
©
Eye to Eye Productions
Architect: Rick Mather Architects
![]()
The buildup.
Move your cursor across the thumbnail images below to view the sequence.

![]()
Entering the museum at the main entrance.

![]()
Moving from the main entrance, along the timeline gallery.

![]()
The Timeline shows artefacts through the passage of time

![]()
Continuing on towards the lightwell

![]()
Looking up at the lightwell

![]()
We reach the Portrait Gallery

![]()
An overview of the lightwell and galleries

![]()
The new Education Centre

![]()
3D wireframe screengrabs:
![]()

![]()

![]()

![]()